Skip to content
Environmental technician collecting air samples inside an industrial facility

Capability

Asbestos, Lead & Hazardous Materials Abatement

IEI plans and executes abatement and remediation of asbestos, lead-based paint, mold, PCBs, heavy metals, and other hazardous materials.

$40M+Hazardous-material abatement and remediation experience
200,000 LB/YRLead hazardous waste captured, abated and disposed on a federal program
15,000+ SFLarge-scale ACM floor/ceiling tile removal
800+ LFACM piping removal on an overseas project

The challenge

Abatement work carries regulatory, schedule, and human-health risk simultaneously. The planning is as important as the removal.

How we execute

  1. 01

    Assess, sample, and characterize before writing the abatement approach.

  2. 02

    Build containment, monitor air, and document clearance.

  3. 03

    Coordinate transportation and disposal with full chain-of-custody records.

Scope

IEI delivers

  • Asbestos abatement
  • Lead-based paint abatement
  • Mold remediation
  • PCB-related services
  • Heavy metal remediation
  • Hazardous materials management
  • Hazardous waste removal
  • Firing range metals mitigation and abatement
  • Demolition
  • Containment systems
  • Sampling plans
  • Air monitoring
  • Remediation planning
  • Waste characterization
  • Disposal coordination
  • Emergency response
  • Water intrusion response
  • Water damage mitigation and restoration
  • Odor control and mitigation
  • Materials decontamination
  • Health & Safety Plans
  • EM 385-1-1 planning
  • HAZCOM
  • Accident Prevention Plans (APP)
  • Activity Hazard Analyses (AHA)

IEI in the field

Worker in a full white protective suit and respirator operating a floor removal machine inside a plastic-sheeted containment area
Flooring removal under full containment
Mold growth on the exposed studs and sheathing of a wall cavity during a microbial remediation assessment
Mold assessment in an opened wall cavity
IEI technician on a ladder connecting a vacuum hose to an above-ceiling air duct opening during remediation work
Above-ceiling duct remediation access
Bee removal specialist in a protective suit covered with honeybees during a live bee removal, with a second specialist nearby
Hazardous bee removal in protective suits
IEI technician in a high-visibility vest and hard hat servicing an underground valve inside an active excavation
Field service in an active excavation
Remote-operated tracked equipment cutting overgrown vegetation across a field while an operator monitors it
Remote-operated site equipment

Credentialed professionals

CIHCSPCHMMPEPMPAHERA-trained / certified personnel

Complex environments

Abatement where the building can't simply be closed

IEI performs abatement in occupied federal buildings, courthouses, classified facilities, diplomatic facilities, firing ranges, and other high-security environments.

Classified Washington, DC facilities

Demolition and hazardous materials abatement within high-security intelligence and defense environments requiring cleared labor.

Federal courthouse

Eight stories of vertical riser pipe insulation removal.

800+ LF

Overseas facility

ACM piping removal.

Projects & Past Performance

Hazard Abatement & Remediation projects

USSS Training Ranges

Lead Hazardous Waste Management

Approximately 200,000 pounds annually of lead hazardous waste captured, abated and disposed.

Related

Connected capabilities

Let's talk

Complex mission?
Bring IEI to the table.

Whether you're maintaining a mission-critical facility, addressing an environmental hazard, modernizing infrastructure, improving building performance, or exploring new technology, IEI brings the people and expertise needed to move the mission forward.